S3H Inc.
S3H Inc.
  • Home
  • About S3H
    • Meet the Corporate Team
    • Meet the Field Team
  • Services
  • S3H Projects
    • Project Gallery
    • S3H Timeline
  • Contact Us

Nearly 20 Years of Excellence: A Timeline of Success and Innovation with S3H

2005 - 2012

CityCenter Las Vegas


Performed HVAC and plumbing construction services for a 90,000-square-foot two-story office building 'Perini' at CityCenter. Installed HVAC system to include rooftop air-cooled packages, split units, and plumbing, providing storm, sewer, gas, and domestic cold and hot water systems. (Las Vegas, NV)

2012-2019

7th & Fig


Performed the core and shell HVAC demolition of existing systems and installation of new HVAC systems. Upgrading the 3-story, 513,000-square-foot retail center, the project includes redesigning the complete life safety smoke control systems, kitchen grease exhaust, and make-up air systems (Los Angeles, CA)

2020-Present

Morongo Casino


Construction services included design-assist HVAC and plumbing construction services for a 200,000-square-foot casino, restaurant renovation, a 75,000-square-foot casino expansion, and integrating new air handling units with a 14 MW Cogeneration facility. (Beaumont, CA)

  • Meet the Corporate Team
  • Meet the Field Team
  • Services
  • Contact Us
  • Employment

S3H Inc.

Copyright © 2024 S3H Inc. - All Rights Reserved.